I.    GENERAL

1.01    SUMMARY

  • Provide labor, materials, equipment and supervision necessary to install a silicone coating system as outlined in this specification to preserve and extend the service life of weathered PVC and TPO roofing.
  • The manufacturer's application instructions for each product used are considered part of these specifications and should be followed at all times.

1.02    SUBMITTALS

  • Submit product data sheets and literature verifying physical properties of materials.
  • Submit material safety data sheets.

1.03    QUALITY ASSURANCE

  • Supplier Qualifications: The SRC Silicone Roofing System for weathered PVC and TPO Roofs, as supplied by National Coatings Corporation, is approved for use on the project.
  • Applicator Qualifications: The applicator shall be approved by National Coatings Corporation to apply the system. Manufacturer's written verification of applicator approval is required.

1.04    PRODUCT DELIVERY, STORAGE AND HANDLING

  • Containers and Packaging: Deliver materials in original sealed containers, clearly marked with: manufacturer’s logo; full product name; and lot number(s).
  • Storage: Store materials between 40ºF and 100ºF with careful handling to prevent damage to products. If conditions exceed these ranges, special consideration in storage must be taken. Do not store at high temperatures in direct sunlight.

  • Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
  • Protection: Protect all materials from freezing and other damage during transit, handling, storage, and installation.

1.05    PROJECT  CONDITIONS

  • These minimum recommendations for material usage are for ideal conditions. The number of gallons per 100 square feet may need to increase due to uneven application, rough surface texture, wind conditions while spraying and/or other variables.
  • Wet insulation must be thoroughly evaluated and then addressed with removal or other measures. Consult a National Coatings Technical Consultant regarding the need for moisture surveys and other assessments.
  • Structural cracks should be referred to the appropriate National Coatings Technical Consultant.
  • This installation guide specification assumes that the deck, if plywood, has no dry rot, and is in sound condition, or has been repaired.
  • Do not apply materials unless surface to receive silicone roofing system is clean, dry and prepared as specified.
  • Install all material in strict accordance with all published safety, weather, or applicable regulations of the manufacturer and/or local, state, and/or federal agencies which have jurisdiction.
  • The entire system shall be fully adhered to the surface on which it is applied. Voids left under the system by creating bridges are not acceptable.
  • Do not proceed with application of coating or sealing materials when temperature is less than 35ºF. No coating system shall be applied if weather will not permit it to dry prior to exposure to precipitation or freezing.
  • Heavy puddles of coating on the roof are not acceptable.
  • Instructions for use of all roofing materials and application equipment should be read and followed at all times.
  • As a general principle, to prevent the ponding of water, install additional drains as necessary.

1.06    DETAIL WORK

  • This specification does not extensively outline procedures for preparation and finishing of drains, vents, ducts, flashings, parapet walls, sheet metal work, etc. This work should be outlined by the contractor before work commences, and shall be performed observing good trade practices.

II.   PRODUCTS

2.01    ACRYSHIELD ROOF MANAGEMENT SYSTEM

  • The roofing system is the SRC Silicone Roofing System Provided by National Coatings Corporation.
  • Physical Properties of Cured Roofing System: 

    • The roofing system shall have good resistance to ponding water.

    • The roofing system shall contain no plasticizers.

    • The roofing system shall contain no migrating fire retardants. 

    • The roofing system shall have a Class A fire rating on a noncombustible deck when tested according to the procedures outlined in ASTM E-108. 

    • The roofing system shall also meet the following physical property requirements: 

Property

ASTM Method

Results

Tensile Strength, psi (Max @ 73ºF)

D-412

Minimum 247

% Elongation @ Break (73ºF)

D-412

Minimum 237

Weathering/UV Resistance:

D-6694

No degradation - 5000 hrs

Permeance, perms

E-96

   10.7

Volume Solids %
Weight Solids %

D-2369

92+/-3
92+/-3

  • The reinforcing fabric shall be Tietex T272 or an equivalent that meets the following physical property requirements:

Properties

Test Method

Average Value

 

 

T272

Weight (per sq. yard)

Calculated by formula

3 ounces

Bursting Strength (lbs)

ASTM D3786

177

Tensile Strength (psi)

ASTM D1682

57.1

Tear Strength (lbs)

ASTM D1117

16.1

Elongation (%)

ASTM D1682

62

Conformability

 

Excellent

Ease of Saturation

 

Excellent


2.02    RELATED MATERIALS

  • Flashing, adhesives, thinners, elastomeric caulking compounds, primers, and similar materials shall be approved by the manufacturer of the coatings. All materials used shall be applied in accordance with its manufacturer's recommendations.

2.03    EQUIPMENT

  • For recommended spray equipment guidelines, please refer to National Coatings Technical Paper "TP-102 Guide for Selecting Coating Spray Equipment", or consult the spray equipment manufacturer directly.

III.  EXECUTION

3.01    MANUFACTURER’S INSTRUCTIONS

  • Compliance: Comply with manufacturer’s product data, including product technical bulletins and product guide specification instructions.

3.02    EXAMINATION

  • Inspect surfaces which will receive the SRC Silicone Roofing System to make sure they are clean, smooth, sound, properly prepared, and free of moisture, dirt, debris, or other contamination.
  • Verify that all roof penetrations, mechanical equipment, cants, edge metal, and other on-roof items are in place and secure.
  • Verify that all critical areas around the immediate vicinity of the spray area are suitably protected.
  • Verify all roof drains are clean and in working order.
  • Verify that all air conditioning and air intake vents are suitably protected or closed.
  • When properly applied, SRC silicones from National Coatings are not affected by ponding water. However, the National Roofing Contractors Association (NRCA) considers ponding water objectionable due to structural and health concerns. The NRCA recommends that all roof assemblies have positive drainage. NCC strongly recommends following established NRCA guidelines.

3.03    PREPARATION

  • The surface must be clean, sound, dry and free of any materials that would inhibit proper adhesion of the coating or sealant. Achievement of this condition may require the use of INDUSTRIAL CLEANER, scraping, power brooming, vacuuming or other means, and shall always be performed observing responsible trade practices.

  • Pressure wash the membrane free of any significant accumulation of dirt and debris prior to applying the base coat. Where unsealed membrane or seam defects are discovered, avoid introducing water beneath the membrane by using lower pressure and/or manual rinse techniques.
     
  • Adhesion testing should be completed as per NCC technical bulletin.
  • The roof shall be primed with Roof Primer A504 at a rate of 3⁄4 gallon per 100 SF. Allow the A504 to fully cure before applying SRC roof coating. Acrylic primer must be applied before any silicone product to ensure compatibility.

  • All loose seams of existing roof system shall be sealed in accordance with the single ply manufacturer’s recommendations. Then seal all single ply seams with BUTYL SEAM TAPE.
  • Seal all HVAC duct work joints as needed with Flashing Grade Silicone Sealant and reinforcing polyester fabric or BUTYL SEAM TAPE. Coat entire duct assembly with a 1 gallon coat of SRC roof coating.

  • Reseal around all mechanical equipment and roof penetrations with Flashing Grade Silicone Sealant architectural sealant and, where possible, T272 reinforcing fabric.

  • At parapets, firewalls, expansion joint curbs, mechanical curbs or skylights Flashing Grade Silicone Sealant and T272 in a three course detail to overlay all uncured flashing located less than 5 inches above the deck. Flashing extending above 5 inches shall be flashed in using Flashing Grade Silicone Sealant only.

  • Allow coating to dry thoroughly (normally 4 to 12 hours depending on weather conditions), before proceeding to application of the remainder of the roofing system as described in section 3.04 of this guide specification.
  • For additional information regarding projects over newly installed PVC contact NCC Technical Services.
  •  

3.04    COATING APPLICATION

  • After thorough preparation as necessary, the entire roof shall receive the SRC Silicone Roofing System consisting of silicone coating in one or two passes over entire roof surface to achieve a final thickness of:

22 mils (1.5 gallons per square) minimum for a 10 year warranty

30 mils (2.0 gallons per square) minimum for a 15 year warranty

38 mils (2.5 gallons per square) minimum for a 20 year warranty

  • While spraying the silicone coating, special effort should be made to have pass lines overlap on membrane seams as to provide additional coating thickness on the seams.

  • All coating edges shall be cut evenly in a uniform manner so as to provide an aesthetically pleasing appearance.

3.05    FIELD QUALITY REQUIREMENTS

  • In case of manufacturer’s labor and material warranty - Manufacturer’s Field Services: Inspection by the coating manufacturer's representative shall be made to verify the proper installation of the system. Any areas that do not meet the minimum standards for application as specified herein shall be corrected at the contractor's expense. Manufacturer's inspection or verification shall not constitute acceptance of responsibility for any improper application of material.

3.06    CLEANING

  • Surfaces not intended to receive the SRC Silicone Roofing System shall be protected during the application of the system. Should this protection not be effective, or not be provided, the respective surfaces shall be restored to their proper conditions by cleaning, repairing or replacing. All debris from completion of work shall be completely removed from the project site. Mineral Spirits can be used to remove coating from unintended surfaces.

IV. MATERIALS

The following materials listed in these recommendations are available from National Coatings Corporation:

  1. SRC 740 or SRC 750 high solids silicone roof coating

  2. Roof Primer A504

  3. Flashing Grade Silicone Sealant

  4. BUTYL SEAM TAPE polyester-reinforced waterproofing tape

  5. T272 polyester-reinforcing fabric 6-inch, 10-inch, 20-inch and 40-inch

  6. INDUSTRIAL CLEANER water-based, biodegradable cleaner